Tag Archives: Krav Maga

21 Stripes

21 Stripes
Photo-A-Day 2.0 #01619

In our dojo we earn stripes with monthly progress checks. When you are starting out in Krav Maga and also kids karate your early belts require 3 stripes to advance. So, if you are doing well you will have a belt with 3 stripes on it and then would advance to a new belt. This happened from White to Green belts. When you get to Brown belt you need 6 stripes to advance to the next belt. A longer time to learn new techniques and to earn that new belt. When I attempted to go for my Black Belt in November of 2021 I had my six stripes on my red/black belt. I was not ready at that time and did not advance past the pre-test. I kept at it for another year and a half before going to test again. I had 2 opportunities after my initial test and before tomorrow’s final test to make another attempt at my black belt. The first time I was eligible was the next class in the Spring. I honestly had my confidence really shaken and it took me a long time to get it back. I decided that I would go for it in the Winter of 2022 but I got COVID right before the evaluation and it destroyed my lung capacity. I was also not in the best level of conditioning.

The number of stripes on my belt sort of became a issue for me, personally. It kept saying to myself that at the rate I was going my belt was going to be black one way or another, either full or stripes or an honest to goodness black belt. So, I put my mind to it that I would go for it at the next opportunity. Well, tonight was the last boot camp and tomorrow is my final test. Wish me Good Skill, I’m gonna need it.

Airing Out The Stink

airing the stink
Photo-A-Day 2.0 #01611

I had to take out everything from our krav bags and air them out on the driveway after the kids’ class. With the shift in weather and the trunk heating up it is more important to make sure I air everything out several times a week and also spray everything down. I had been using Hero Clean for deodorizing but I ran out of the stuff and you can’t find it anymore. I’m going to have to find a replacement.

floor tiles

Dad came up again today and he finished laying the bathroom tile. So, now we are down to grouting the tile and putting back things like the medicine cabinet and putting up the light and towel rods and a few more things. I also have to touch up the paint and fill the nail holes in the baseboard and give them another coat of paint.